Inside a Multi-Phase Commercial Site Prep: The Inntelex Approach

June 30, 20252 min read

Not every commercial project happens all at once. In fact, most large-scale developments roll out in carefully timed phases — utilities first, then foundations, parking, drainage, and so on. The excavation partner you bring in at the start needs to be able to think beyond the first week of dirt work.

That’s where Inntelex stands out. Their approach to multi-phase site prep is built on experience, coordination, and the ability to move at scale without losing accuracy. This is also what separates Inntelex from the majority of Southern Utah excavation companies.

Phase One: Site Access, Survey Support, and Utility Corridors
Before anything vertical happens, Inntelex clears the path — literally. That means cutting in access roads, working closely with survey teams, and creating trench routes for sewer, water, storm, and power. These corridors need to be dug deep, precisely graded, and reinforced to meet city code and long-term load requirements.

Phase Two: Pads, Parking, and Public Pathways
Once utilities are in, attention turns to building pads, retaining walls, and site grading for pavement. Inntelex handles these transitions without needing a reset. They keep the same crew and equipment on-site, adjusting to the scope as needed. Commercial pads are compacted and leveled to spec, and ADA pathways, sidewalks, and parking lots are framed in with drainage in mind from the start.

Phase Three: Backfill, Final Grade, and Erosion Control
As vertical construction gets underway, Inntelex returns for backfill, perimeter grading, and erosion control. Their crews coordinate with inspectors to close out trench permits and ensure the site meets environmental standards. This final stage is critical — it prepares the property for landscaping, signage, and occupancy approvals.

What Makes the Inntelex Approach Different?
It’s not just the equipment — it’s the way they plan. Every Inntelex job starts with a schedule that accounts for all three phases, not just the first. They stay in sync with the general contractor, engineering team, and city inspectors from day one to turnover.

In an industry where subs often come and go, Inntelex provides continuity across the full life of the site prep — and that leads to fewer delays, fewer miscommunications, and cleaner execution overall.

Commercial site development isn’t a one-and-done job — it’s a multi-stage operation that demands precision at every step. Inntelex brings the scale, systems, and site intelligence to move seamlessly through each phase. That’s why their work continues long after the first shovel hits the ground.